The Web Server Migration
Up to five sites moved to a new server with their configuration and databases, proven working there before a single visitor is sent across — and the old server left untouched, so going back is one DNS change.
Moving a live site to a new server is the job that keeps getting postponed, because when it goes wrong it goes wrong in public: broken pages, a dead checkout, and no quick way back.
We rebuild your sites on the new server and show you each one working there — real pages, real database, HTTPS — while the old server carries on serving your visitors as normal. The switch itself is a DNS change you make, in a window you choose, with our engineer on standby and a final sync so nothing from the last minute is left behind.
The old server is never stopped or altered, so if anything looks wrong you go back with the same DNS change in reverse. Moving between web servers is part of the job, including the common modernisation onto Caddy. Our administrators have been moving live estates since 2003.
What's included
Up to five sites moved with their files, server configuration and databases — database names and credentials preserved, so your application code needs no edits
Every site proven working on the new server before any traffic reaches it, checked while your old server keeps serving
A change of web server software handled as part of the move — Apache or nginx onto Caddy, or any direction among the three
A written cutover plan you can follow: the exact DNS records to change, the timing, and the one-line way back
An engineer on standby through your cutover window, with a final file and database sync inside it
Your old server untouched from start to finish, so rollback is the same DNS change in reverse
A plain-English handover of what moved, where it now lives, and what deliberately stayed behind
Before you order
Have these ready so we can start the moment you order. The delivery clock only runs while we have them.
SSH access with sudo or root to both machines. The old server must not be run through cPanel, Plesk or a similar panel
A new server with Caddy, nginx or Apache already installed, plus the same database engine if your sites use one
The sites to move (up to five), with where each one's files live and the databases and database users it connects with
Access to edit your DNS, and a cutover date and time window when you can make the switch
Any site certificates that are not already on the old server
How it works
Book it — pay the fixed price and tell us the target environment. No scoping call first.
We deliver — an experienced specialist runs our standard workflow for this exact task. You can watch progress and message them in the portal.
Hand-off — you get the deliverables, the documentation, a rollback snapshot, and a walkthrough if you want one.
Who does it
A salaried Support Resort specialist with more than ten years in the field, working from a runbook we've been refining since 2003 — supervised by senior management, never a marketplace contractor. You'll see who is assigned and can message them about this task directly in your portal.
FAQ
Ask about this task
Our assistant knows the scope document and runbook behind this service. Ask what's covered, what isn't, or whether it's the right task for your situation.
Answers come from our published scope documents. Prefer a person? Switch to the "Email us" tab — a senior manager replies personally, usually the same weekday.
Related services
The Web Server Install
We turn a fresh Linux server into a secured, fast web server — Caddy, Nginx, or Apache — closed off to the exposures attackers scan for and sized to handle real traffic, ready for the sites you put on it next.
The Virtual Domain Setup
Put a live domain on a web server you already run, pointed at your folders or apps (up to five paths), with its own logs and redirects, your SSL certificate installed, and PHP wired up where your site needs it. Priced per domain: book one, or as many as you need.
The Database Install & Hardening
Your choice of PostgreSQL, MySQL, MariaDB, or MongoDB stood up and locked down before it holds a byte of real data — connections closed to everyone you haven’t named, and a nightly backup running from the first night.
The Website Migration
One of our web engineers moves your whole website to the hosting you've chosen, while your old site keeps serving visitors until the switch. Your first day starts with a written plan that estimates how many days the move will take.